TYPICAL ONSITE PROJECT
OUR INNOVATIONS
TYPICAL ONSITE PROJECT
Hydraulic Hose Management
- Stena IceMax – Drillship 5 Year SPS Complete hose replacement and PTS hose management system installed. 3500 hoses manufactured onsite
- COSL Promoter – Semi sub 5 Year SPS Complete hose replacement and PTS hose management system installed. 1000 hoses manufactured onsite
- Scarabeo 9 – Semi sub BOP hose replacement and PTS hose management system installed.
- Akofs Wayfarer – Multi Purpose Offshore Vessel Complete hose replacement and PTS hose management system installed. 500 hoses manufactured onsite
- Stena Drillmax – Drillship 10 year SPS 2500 hoses manufactured onsite based on PTS history.
- COSL Prospector – Semi sub 5 Year SPS Complete hose replacement and PTS hose management system installed. 1800 hoses manufactured onsite.
- Fatih (formerly Deepsea Metro 2) – Drillship Ongoing SPS project. To remove, produce and install in excess of 2000 hydraulic hoses.
- Seadrill West Polaris hydraulic hose change out on MAIN and AUX Hydrarackers. Flushing and installation of CMC 8” & 10” piping and Olmsted valve.
Rope Access, Rigging, Electrical
- Repair of main cable tray support to the Derrick
- Change out of Crown Mounted CAPV’s
- Change out of Active Heave Cylinder AUX Well
- Change out of Fast Line Stabilisers MAIN & AUX Well
- Change Out of Active Heave Cylinder MAIN Well
- Change out of Main Boom & Knuckle Boom cylinders
- Change out of MAIN & AUX TDX 1250 Top Drives
Rigalign Surveys
Surveyed multiple Guide Rails, Top Drives, Travelling Gear and Racking Systems..